Build
How to build a log store: a simple raised, slatted frame
Plan and build a timber log store with a drained base, restrained bays, open walls and a sloping roof.
Build from the ground up: stable base, raised bearers, stiff frame, slatted floor and walls, then a roof that throws water clear. Size the clear internal bays before cutting the frame.
1. Draw the usable space
Start with required stacked volume. Choose depth from normal log length and height from safe reach, then solve for width. Break a long width into bays. Add posts, braces and overhang to obtain the external footprint.
Mark that footprint on the site. Check the walking route, roof runoff, boundary and any planning constraint.
2. Specify outdoor timber
Ask the supplier to confirm the treatment Use Class and intended service life in writing. Timber above ground but exposed outdoors is generally a Use Class 3 application. Components in ground contact or severe permanent wetting need a specification suited to that exposure. Keep timber off the ground wherever practical.
Seal or treat cross-cuts as the treatment supplier directs. Do not assume a decorative stain upgrades unsuitable timber.
3. Make a level, drained base
Prepare sound paving, pads or a compacted base. Support every load path. Set raised bearers so water and debris can pass beneath rather than collecting against the floor.
4. Build and brace the frame
Assemble front and rear frames square, join them with depth rails, then add diagonal bracing before loading. Use exterior fixings compatible with the timber treatment and roof material. Anchor the empty structure according to the site exposure and fixing design.
5. Fit floor and retaining slats
Space floor members so short logs remain supported. Side and rear slats should retain pieces without becoming solid panels. Leave the front open. Keep a free gap behind the finished store.
6. Add the roof
Give the roof a positive fall and overhang. Lap the weathering layer in the direction water runs. Direct runoff away from the stack, wall, path and feet. Make the covering replaceable.
7. Inspect before loading
Check square, fixings, sharp edges, wobble, roof drainage and floor support. Load the first bay gradually and watch for movement. Correct a lean before filling the rest.
Sources
- Wood Protection Association buyer's guide to treated wood — Use Class and purchasing guidance, checked 10 November 2026.
- Planning Portal: outbuildings — England siting and height rules, checked 10 November 2026.
- Forest Research: Domestic heating with logs — storage arrangement, checked 10 November 2026.