Build
Log store repairs: empty the bay before fixing the structure
Repair rotten feet, loose bracing, damaged slats and leaking roofs without working against a loaded stack.
Unload the affected bay and make it stable before repair. Logs hide damage and keep failed members under pressure.
Triage in order
- Movement, leaning or failed anchors.
- Broken floor members and rotten load paths.
- Roof leaks and loose covering.
- Missing retaining slats.
- Surface finish.
Replacing a cosmetic board while a foot sinks is wasted effort.
Match the exposure
Use replacement timber specified for the outdoor end use and compatible exterior fixings. Protect new cross-cuts as the treatment supplier directs. Do not splice a rotten structural post just above the visible decay without checking how far moisture damage extends.
Keep repairs inspectable
Avoid metal plates that create hidden water traps or plastic liners that conceal the timber. A straightforward new member with drainage and accessible fixings is usually easier to monitor.
Reload slowly
Confirm the frame is square, the roof drains and anchors are sound. Add the first courses evenly. Recheck after a wet week and after the next full delivery.